Stop chasing the same answer.
A bid lead needs the current response, its owner and its next reviewer. Email threads and separate drafts make that harder to establish.
FOR IAM BID, ARCHITECTURE AND DELIVERY TEAMS
Find the source behind an answer. Review what applies to this tender. Make missing evidence and unpriced scope visible while there is still time to act.
A bid lead needs the current response, its owner and its next reviewer. Email threads and separate drafts make that harder to establish.
A good answer from a previous tender may contain assumptions that do not apply today. Verify the source and review the changes.
Application counts, custom connectors, data quality and cutover windows can change the estimate. Record the dependency before promising delivery.
CLIENT PERSPECTIVES

“BidGenX brings our tender documents, responsibilities and proposal reviews into one workspace, helping our team spend less time coordinating and more time developing the right response.”

“Connecting requirements, architecture and supporting evidence makes technical reviews easier. AI-assisted drafting gives our specialists a starting point while keeping validation and approval with our team.”
THREE-STEP PRODUCT DEMO
Find a relevant source, adapt the answer to your tender and save a draft for your team to review. Follow the steps below using an illustrative IAM migration example.
STEP 1 OF 3
Avoid asking specialists to rewrite an answer that already exists.
Read the approved source and its version before selecting an answer.
Does this source apply to the current requirement?
Read the approved source and its version before selecting an answer.
Check the source version and confirm that its scope matches your requirement.
Review question: Does this source apply to the current requirement?
Compare the original and adapted wording. Accept it, retain the original or discard it.
The adapted draft explicitly leaves the four-hour cutover commitment unverified.
Review question: Which wording can your delivery team stand behind?
Refine the draft, record the unresolved commitment and save it for human review.
Save your changes and assign the next reviewer before submission.
Review question: What must be checked before this draft can be submitted?
Source matching and drafting support human review. They do not establish compliance or approval.
COMPLETED IAM SCOPE AND EVIDENCE WORKBOOK
Fictional worked example. All organisations, roles, requirements, sources and figures in this workbook are illustrative. They are not customer results, a BidGenX price or a market benchmark.
Two pilot applications, followed by three waves of six. The tender requires a staged migration, rollback rehearsal and handover, with a maximum four-hour cutover per application.
The method describes staged delivery and rollback. Application-level timing evidence is missing.
Decision: HOLD. The mandatory cutover commitment is not substantiated.
The architect obtains dependency and pilot timing evidence. The bid lead submits a clarification and schedules a gap review before submission.
46 person-days plus 15% contingency gives 52.9 days. At an illustrative CHF 1,200 per day, the total is CHF 63,480 excluding tax.
If the mandatory cutover condition cannot be met, escalate bid/no-bid. An assumption does not override the requirement.
Effort breakdown: discovery 6, design 8, configuration 14, testing 10, handover 4 and management 4 person-days. Total 46 plus 6.9 contingency. Effort is not elapsed delivery duration.
FREE VERIFIED DOWNLOADS
Choose a resource, register and verify your work email. Your verified session gives you access to all four PDFs for 24 hours. Newsletter updates are optional.
Both workbook PDFs have 20 labelled editable fields. The completed example is also readable above in HTML. Use the HTML workbook if you prefer to work in your browser.
Explore how your team could find supporting knowledge, review a draft and identify the decisions still needed before submission. Guided demonstrations and consultation are paid services; review the details before booking.
View demonstration options